Skip to main content
Contact Us
Pay Online
Outage Center
Load Control Status C & I
Load Control Status Residential
Home

Call Us: (800) 734-6421 | (507) 373-6421

Menu
  • COMMUNITY
    • Heartland Security
    • Links
    • Member Engagement Group
    • Operation Round Up
    • Youth Tour
    • Scholarships
    • POLITICAL ACTION
      • Co-op Vote
      • America's Electric Cooperatives PAC
  • OUTAGE INFO
    • Power Outages
    • Outage Center
  • REBATES
    • Rebates
  • MY COOPERATIVE
    • Annual Meeting
    • About Touchstone Energy
    • Careers
    • Capital Credits
    • Contact Us
    • Heartland Security
    • History
    • Privacy Notice
    • Statement of Non-Discrimination
    • About Us
    • Bylaws and Articles
    • BOARD OF DIRECTORS
      • Board of Directors
      • Director Elections
      • Electronic Voting
    • NEWS & INFO
      • News
      • Newsletter
    • SAFETY
      • Downed Power Lines
      • Electric Safety
      • Farm Safety
      • Safety Demonstration
      • Continuity of Service
  • SERVICES
    • ELECTRIC SERVICE
      • Line Clearance
      • Service Upgrade & Relocation
        • Disconnections & Reconnections
      • Call Before Digging
      • Vegetation Management
      • Who's Responsible?
      • New Construction
    • ENERGY SERVICES
      • Energy Audits
        • Home Energy Audit
        • Farm Energy Estimator
        • Touchstone Energy Guide
        • Links & Tools
      • Special Rates
        • About Special Rates
      • Compare Fuels
      • Financing
      • Energy Saving Guides
      • Electric Vehicle
      • Summer Shift
      • RENEWABLES
        • Evergreen Program
        • Interconnection Information
        • Utility Scale Solar
      • HomeServe
      • Load Control - C & I
      • Load Control - Residential
      • Water Heater Program
    • MEMBER SERVICES
      • New Member
      • Billing & Usage
      • Energy Assistance
      • Update Your Contact Information
      • Payment Options
      • Bill Inserts
      • Outdoor Area Lighting
      • FORMS
        • Online Forms
        • Downloadable Information
      • Limited English Proficiency
      • Military Disconnection Protection

New Construction

You are here

  1. SERVICES
  2. ELECTRIC SERVICE
  3. New Construction
  4. New Construction

NEW CONSTRUCTION

If you're planning for a new single-phase electric service, or a new three-phase service, or another application, it's time to contact our office. You can call (800) 734-6421 or (507) 373-6421 or stop by during normal business hours.

You will need to contact our staking technician with information regarding the proposed location of your metering and the requested date for the new service. Wiring behind the metering point must be completed by the consumer or the electrical contractor of their choice before construction begins.

When everything is in place, the work order is put on our construction schedule. The actual completion time varies depending on such factors as current workload, complexity of the service installation, and weather-related conditions.

Building a New Home Flyer

In The Business 

 

New Construction

While we do our best to accommodate your construction schedule, adequate lead time is necessary for us to obtain the needed equipment. This is especially important in regard to three-phase service requests. The sooner you can let us know your project requirements, the better able we will be able to meet your service request.

Back to Top

Quick Links

  • Contact Us
  • News
  • Statement of Non-Discrimination
  • Privacy Policy
  • Load Control C & I
  • Load Control Residential

Our Location

Feedback

We'd Like To Hear From You...

As a member of an electric cooperative, you have a voice.

Click here to submit a comment or question.

Follow Us Online

Holiday Schedule

OUR OFFICE WILL BE CLOSED THE FOLLOWING HOLIDAYS:
   
2024 Holidays  
Thanksgiving  Thursday, November 28, 2024
Thanksgiving (Day After) Friday, November 29, 2024
Christmas Eve Day  Tuesday, December 24, 2024
Christmas Day  Wednesday, December 25, 2024
2025 Holidays  
New Year's Day  Wednesday, January 1, 2025
FMEC Staff Development Day Monday, February 17, 2025
Memorial Day  Monday, May 26, 2025
Independence Day  Friday, July 4, 2025
Labor Day Monday, September 1, 2025
Thanksgiving Thursday, November 27, 2025
Thanksgiving (Day After)  Friday, November 28, 2025
Christmas Eve Day Wednesday, December 24, 2025
Christmas Day Thursday, December 25, 2025
   

©2025 Freeborn Mower Electric Cooperative. All Rights Reserved.

  • COMMUNITY
    • Heartland Security
    • Links
    • Member Engagement Group
    • Operation Round Up
    • Youth Tour
    • Scholarships
    • POLITICAL ACTION
      • Co-op Vote
      • America's Electric Cooperatives PAC
  • OUTAGE INFO
    • Power Outages
    • Outage Center
  • REBATES
    • Rebates
  • MY COOPERATIVE
    • Annual Meeting
    • About Touchstone Energy
    • Careers
    • Capital Credits
    • Contact Us
    • Heartland Security
    • History
    • Privacy Notice
    • Statement of Non-Discrimination
    • About Us
    • Bylaws and Articles
    • BOARD OF DIRECTORS
      • Board of Directors
      • Director Elections
      • Electronic Voting
    • NEWS & INFO
      • News
      • Newsletter
    • SAFETY
      • Downed Power Lines
      • Electric Safety
      • Farm Safety
      • Safety Demonstration
      • Continuity of Service
  • SERVICES
    • ELECTRIC SERVICE
      • Line Clearance
      • Service Upgrade & Relocation
        • Disconnections & Reconnections
      • Call Before Digging
      • Vegetation Management
      • Who's Responsible?
      • New Construction
    • ENERGY SERVICES
      • Energy Audits
        • Home Energy Audit
        • Farm Energy Estimator
        • Touchstone Energy Guide
        • Links & Tools
      • Special Rates
        • About Special Rates
      • Compare Fuels
      • Financing
      • Energy Saving Guides
      • Electric Vehicle
      • Summer Shift
      • RENEWABLES
        • Evergreen Program
        • Interconnection Information
        • Utility Scale Solar
      • HomeServe
      • Load Control - C & I
      • Load Control - Residential
      • Water Heater Program
    • MEMBER SERVICES
      • New Member
      • Billing & Usage
      • Energy Assistance
      • Update Your Contact Information
      • Payment Options
      • Bill Inserts
      • Outdoor Area Lighting
      • FORMS
        • Online Forms
        • Downloadable Information
      • Limited English Proficiency
      • Military Disconnection Protection